HURTOWNIA 6

 0    7 cartonașe    vanessapoplawska
descarcă mp3 printează joacă Testează-te
 
Întrebare Răspuns
Risk Management
începe să înveți
Zarządzanie ryzykiem
(applied to) Risk Management is performed according Lo P5.72 and applied to processes, complaints, deviations, transports, self-inspections.
începe să înveți
(stosowane do) Zarządzanie ryzykiem odbywa się zgodnie z Lo P5.72 i jest stosowane do procesów, skarg, odchyleń, transportów, samooceny.
A schedule of yearly risk analyses is prepared.
începe să înveți
Przygotowywany jest harmonogram rocznych analiz ryzyka.
(due date) The columns of the list are area, first/continuous analysis, operation team, due date.
începe să înveți
(data zakończenia) Kolumny listy to: obszar, pierwsza / ciągła analiza, zespół operacyjny, data zakończenia.
(consists of) A report is created at the end of the year, this report consists of a short description of every analysis.
începe să înveți
(składa się z) Raport jest tworzony pod koniec roku, raport ten składa się z krótkiego opisu każdej analizy.
Back Up
începe să înveți
Utworzyć kopię zapasową
lncremental back-up is performed daily, full back-up once per week (both on servers, 2 mirroring servers in 2 buildings). Magnetic tapes are stored in a safe at Cefarm.
începe să înveți
Kopie zapasowe są wykonywane codziennie, pełne kopie zapasowe raz w tygodniu (zarówno na serwerach, 2 serwerach lustrzanych w 2 budynkach). Taśmy magnetyczne są przechowywane w sejfie w Cefarm.